Fire stopping in Southwark

Old warehouses, estate blocks, new towers at Elephant and Castle, and offices by London Bridge. All of them have holes in their fire walls.

  • Every seal labelled and photographed
  • BM TRADA / FIRAS-certificated contractors
  • Written price before any work
Get a price

We reply with a written price.

We use these details to reply to you. See our privacy notice.

Two photos on this page are the same blockwork wall. In the first, a vertical joint runs from the slab down to the painted part of the wall, open enough to see into. In the second it has been packed and finished with a white fire-rated sealant, ready for its label. Nothing about it is clever. It just had to be done to the tested depth, and written down.

Southwark is a borough where you find every kind of building within a mile of each other. Converted warehouses in Bermondsey and Rotherhithe. Big estates in Walworth and Peckham. New towers round Elephant and Castle. Offices, hotels and hospitals between London Bridge and Bankside. Victorian terraces in Camberwell, Nunhead and East Dulwich, most of them now flats.

An open vertical joint running down a blockwork wall from the slab
An open vertical joint running down a blockwork wall from the slab

Survey, then install

On most buildings we start with a fire stopping survey: every hole in every fire wall and floor, photographed and numbered. That turns a vague line in a fire risk assessment into a list that can be priced. Then comes the installation.

Our pages on cable tray fire stopping, cavity barriers, fire stop sealant and fire stopping after a fit-out go into the detail.

Who does the work

Installation is carried out by our BM TRADA / FIRAS-certificated contractors. They use tested products, fit them to the maker's details, and put a numbered label on each seal. You get photos and a schedule that you keep with your fire safety records.

Among jobs we have finished: fire stopping renewed in a school block, where old sealant round pipes through a wall was cut out and done again with tested products. And a gas meter cupboard in a block of flats, where the pipes going up into the flats had open holes round them.

The same vertical joint in blockwork filled and finished with white fire-rated sealant
The same vertical joint in blockwork filled and finished with white fire-rated sealant

Cost

Jobs usually start at around £2,000 plus VAT. A survey is priced once we have seen the plans. Send a postcode, the type of building and a photo or two.

How it works

  1. 1Send the detailsThe postcode, the type of building and a photo or two of the gaps.
  2. 2Survey and written priceWe walk the building, record each breach and price the sealing.
  3. 3Sealed and recordedEach seal is fixed, labelled and photographed for your fire safety file.

Where we go

Our certificated contractors cover the whole of Southwark, from Bankside and Bermondsey on the river down to Dulwich and Nunhead.

Need the holes counted and sealed?

Send the postcode, the type of building and a photo or two. We will tell you whether it needs a survey first and what the sealing is likely to cost.

Call 020 3376 6178Get a quote